Applying Robust Fuzzy-stochastic Programming Model in Multi-objective Optimization for Flow-shop Scheduling with Parallel Machines: a Real-life Case Study in an Engine Component Industrial
Keywords:
Flow-shop Scheduling, Machine Breakdown, Mixed-integer Programming, Parallel Processing, Robust Fuzzy Stochastic Programming, Sequencing, UncertaintyAbstract
Resources scheduling, jobs sequencing, and resources assignment are considered the brain activities that play an extremely important role to the business, such as flow-shop scheduling. Additionally, the internal manufacturing environment and the current market are drastically changing, in which attracted significant attention in scheduling under uncertainties. This research aims to investigate the multi-objective flow-shop scheduling with parallel machines under machine breakdown and operational uncertainty. A novel robust fuzzy stochastic programming (RFSP) model is presented to address the unexpected operational disruptions and the inherent uncertainty of processing time. The objective is to optimize the cost of late delivery and the efficiency of manufacturing evaluated by overall equipment effectiveness (OEE) whilst considering the CO2 emissions produced. Eventually, a proposed algorithm is applied with a real-life scheduling data from a German factory that faces a practical situations in machine breakdowns and operational risks with unrelated parallel machines. Thus, this study intends to provide the computational results and useful information for multiple decision processes.
Downloads
References
Low, C. (2005). Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines. Computers & Operations Research, 32(8), 2013-2025. DOI: https://doi.org/10.1016/j.cor.2004.01.003
Vin, J. P., and M. G. Ierapetritou. 2001. “Robust Short-Term Scheduling of Multiproduct Batch Plants under Demand Uncertainty.” Industrial & Engineering Chemistry Research 40 (21): 4543–4554. doi:10.1021/ie0007724. DOI: https://doi.org/10.1021/ie0007724
Lin, X., S. L. Janak, and C. A. Floudas. 2004. “A New Robust Optimization Approach for Scheduling under Uncertainty: Bounded Uncertainty.” Computers & Chemical Engineering 28 (6–7): 1069–1085. doi:10.1016/j.compchemeng. 2003.09.020. DOI: https://doi.org/10.1016/j.compchemeng.2003.09.020
Janak, S. L., X. Lin, and C. A. Floudas. 2007. “A New Robust Optimization Approach for Scheduling under Uncertainty: II. Uncertainty with Known Probability Distribution.” Computers & Chemical Engineering 31 (3): 171–195. doi:10.1016/j.compchemeng.2006.05.035. DOI: https://doi.org/10.1016/j.compchemeng.2006.05.035
Rahmani, D., and M. Heydari. 2014. “Robust and Stable Flow Shop Scheduling with Unexpected Arrivals of New Jobs and Uncertain Processing Times.” Journal of Manufacturing Systems 33 (1): 84–92. doi:10.1016/j.jmsy.2013.03.004. DOI: https://doi.org/10.1016/j.jmsy.2013.03.004
Li, Z., and M. Ierapetritou. 2008. “Process Scheduling under Uncertainty: Review and Challenges.” Computers & Chemical Engineering 32 (4–5): 715–727. doi:10.1016/j. compchemeng.2007.03.001. DOI: https://doi.org/10.1016/j.compchemeng.2007.03.001
Verderame, P. M., J. A. Elia, J. Li, and C. A. Floudas. 2010. “Planning and Scheduling under Uncertainty: A Review across Multiple Sectors.” Industrial & Engineering Chemistry Research 49 (9): 3993–4017. doi:10.1021/ie902009k. DOI: https://doi.org/10.1021/ie902009k
Soofi, P., Yazdani, M., Amiri, M., & Adibi, M. A. (2021). Robust fuzzy-stochastic programming model and meta-heuristic algorithms for dual-resource constrained flexible job-shop scheduling problem under machine breakdown. IEEE Access, 9, 155740-155762. DOI: https://doi.org/10.1109/ACCESS.2021.3126820
Shen, J., Shi, Y., Shi, J., Dai, Y., & Li, W. (2023). An uncertain permutation flow shop predictive scheduling problem with processing interruption. Physica A: Statistical Mechanics and its Applications, 611, 128457. DOI: https://doi.org/10.1016/j.physa.2023.128457
Levorato, M., Figueiredo, R., & Frota, Y. (2022). Exact solutions for the two-machine robust flow shop with budgeted uncertainty. European Journal of Operational Research, 300(1), 46-57. DOI: https://doi.org/10.1016/j.ejor.2021.10.021
Seyedhamzeh, M., Amoozad Khalili, H., Hosseini, S. M. H., Honarmand Azimi, M., & Rahmani, K. (2022). Investigating the two-stage assembly flow shop scheduling problem with uncertain assembling times. Journal of Industrial and Systems Engineering, 14(2), 245-267.
Zanjani, B., Amiri, M., Hanafizadeh, P., & Salahi, M. (2021). Robust multi-objective hybrid flow shop scheduling. Journal of applied research on industrial engineering, 8(1), 40-55.
Marichelvam, M. K., & Geetha, M. (2021). A memetic algorithm to solve uncertain energy-efficient flow shop scheduling problems. The International Journal of Advanced Manufacturing Technology, 115(1), 515-530. DOI: https://doi.org/10.1007/s00170-021-07228-7
Wang, Y., & Xie, N. (2021). Flexible flow shop scheduling with interval grey processing time. Grey Systems: Theory and Application, 11(4), 779-795. DOI: https://doi.org/10.1108/GS-09-2020-0123
Gholizadeh, H., Fazlollahtabar, H., Fathollahi-Fard, A. M., & Dulebenets, M. A. (2021). Preventive maintenance for the flexible flowshop scheduling under uncertainty: A waste-to-energy system. Environmental Science and Pollution Research, 1-20. DOI: https://doi.org/10.1007/s11356-021-16234-x
Schumacher, C., & Buchholz, P. (2020). Scheduling algorithms for a hybrid flow shop under uncertainty. Algorithms, 13(11), 277. DOI: https://doi.org/10.3390/a13110277
Seif, J., Dehghanimohammadabadi, M., & Yu, A. J. (2020). Integrated preventive maintenance and flow shop scheduling under uncertainty. Flexible services and manufacturing journal, 32, 852-887. DOI: https://doi.org/10.1007/s10696-019-09357-4
Amiri, M. F., & Behnamian, J. (2020). Multi-objective green flowshop scheduling problem under uncertainty: Estimation of distribution algorithm. Journal of cleaner production, 251, 119734. DOI: https://doi.org/10.1016/j.jclepro.2019.119734
Nurprihatin, F., Jayadi, E. L., & Tannady, H. (2020). Comparing heuristic methods’ performance for pure flow shop scheduling under certainand uncertain demand. Management and production engineering review. DOI: https://doi.org/10.24425/mper.2020.133728
Qin, W., Zhang, J., & Song, D. (2018). An improved ant colony algorithm for dynamic hybrid flow shop scheduling with uncertain processing time. Journal of Intelligent Manufacturing, 29, 891-904. DOI: https://doi.org/10.1007/s10845-015-1144-3
Shen, J., & Zhu, Y. (2017). Uncertain flexible flow shop scheduling problem subject to breakdowns. Journal of Intelligent & Fuzzy Systems, 32(1), 207-214. DOI: https://doi.org/10.3233/JIFS-151400
Lv, Y., Zhang, J., & Qin, W. (2017). A genetic regulatory network-based method for dynamic hybrid flow shop scheduling with uncertain processing times. Applied sciences, 7(1), 23. DOI: https://doi.org/10.3390/app7010023
Gholami-Zanjani, S. M., Hakimifar, M., Nazemi, N., & Jolai, F. (2017). Robust and fuzzy optimisation models for a flow shop scheduling problem with sequence dependent setup times: A real case study on a PCB assembly company. International Journal of Computer Integrated Manufacturing, 30(6), 552-563. DOI: https://doi.org/10.1080/0951192X.2016.1187293
Liu, G. S., Zhou, Y., & Yang, H. D. (2017). Minimizing energy consumption and tardiness penalty for fuzzy flow shop scheduling with state-dependent setup time. Journal of cleaner production, 147, 470-484. DOI: https://doi.org/10.1016/j.jclepro.2016.12.044
Han, Y., Gong, D., Jin, Y., & Pan, Q. (2017). Evolutionary multiobjective blocking lot-streaming flow shop scheduling with machine breakdowns. IEEE transactions on cybernetics, 49(1), 184-197. DOI: https://doi.org/10.1109/TCYB.2017.2771213
Rahmani, D., & Ramezanian, R. (2016). A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: A case study. Computers & Industrial Engineering, 98, 360-372. DOI: https://doi.org/10.1016/j.cie.2016.06.018
Ebrahimi, M., Ghomi, S. F., & Karimi, B. (2014). Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates. Applied mathematical modelling, 38(9-10), 2490-2504. DOI: https://doi.org/10.1016/j.apm.2013.10.061
Kasperski, A., Kurpisz, A., & Zieliński, P. (2012). Approximating a two-machine flow shop scheduling under discrete scenario uncertainty. European Journal of Operational Research, 217(1), 36-43. DOI: https://doi.org/10.1016/j.ejor.2011.08.029
Fahimnia, B., & Jabbarzadeh, A. (2016). Marrying supply chain sustainability and resilience: A match made in heaven. Transportation Research Part E: Logistics and Transportation Review, 91, 306-324. DOI: https://doi.org/10.1016/j.tre.2016.02.007
Jabbarzadeh, A., Fahimnia, B., & Sabouhi, F. (2018). Resilient and sustainable supply chain design: sustainability analysis under disruption risks. International Journal of Production Research, 56(17), 5945-5968. DOI: https://doi.org/10.1080/00207543.2018.1461950
Hosseini, S., Morshedlou, N., Ivanov, D., Sarder, M. D., Barker, K., & Al Khaled, A. (2019). Resilient supplier selection and optimal order allocation under disruption risks. International Journal of Production Economics, 213, 124-137. DOI: https://doi.org/10.1016/j.ijpe.2019.03.018
Dubois, D., & Prade, H. (1987). The mean value of a fuzzy number. Fuzzy Sets and Systems 24, 279. DOI: https://doi.org/10.1016/0165-0114(87)90028-5
Pishvaee, M. S., Razmi, J., & Torabi, S. A. (2012). Robust possibilistic programming for socially responsible supply chain network design: A new approach. Fuzzy sets and systems, 206, 1-20. DOI: https://doi.org/10.1016/j.fss.2012.04.010
Fortemps, P., & Roubens, M. (1996). Ranking and defuzzification methods based on area compensation. Fuzzy sets and systems, 82(3), 319-330. DOI: https://doi.org/10.1016/0165-0114(95)00273-1
Farrokh, M., Azar, A., Jandaghi, G., & Ahmadi, E. (2018). A novel robust fuzzy stochastic programming for closed loop supply chain network design under hybrid uncertainty. Fuzzy sets and systems, 341, 69-91. DOI: https://doi.org/10.1016/j.fss.2017.03.019
Pishvaee, M. S., & Razmi, J. (2012). Environmental supply chain network design using multi-objective fuzzy mathematical programming. Applied mathematical modelling, 36(8), 3433-3446. DOI: https://doi.org/10.1016/j.apm.2011.10.007
Romero-Silva, R., Hurtado, M., & Santos, J. (2016). Is the scheduling task context-dependent? A survey investigating the presence of constraints in different manufacturing contexts. Production Planning & Control, 27(9), 753-760. DOI: https://doi.org/10.1080/09537287.2016.1166274
Hung, Y. F., Bao, J. S., & Cheng, Y. E. (2017). Minimizing earliness and tardiness costs in scheduling jobs with time windows. Computers & Industrial Engineering, 113, 871-890. DOI: https://doi.org/10.1016/j.cie.2016.12.023
Cheng, C. Y., & Huang, L. W. (2017). Minimizing total earliness and tardiness through unrelated parallel machine scheduling using distributed release time control. Journal of manufacturing systems, 42, 1- 10. DOI: https://doi.org/10.1016/j.jmsy.2016.10.005
Muchiri, P., & Pintelon, L. (2008). Performance measurement using overall equipment effectiveness (OEE): literature review and practical application discussion. International journal of production research, 46(13), 3517-3535. DOI: https://doi.org/10.1080/00207540601142645
Williamson, RM. (2006). Using Overall Equipment Effectiveness: the Metric and the Measures. Columbus, OH: Strategic Work Systems.
Gibbons, P. M. (2006). Improving overall equipment efficiency using a Lean Six Sigma approach. International Journal of Six Sigma and Competitive Advantage, 2(2), 207-232. DOI: https://doi.org/10.1504/IJSSCA.2006.010110
Dunn, T. (2014). Manufacturing Flexible Packaging: Materials, Machinery, and Techniques. William Andrew, 77-85. DOI: https://doi.org/10.1016/B978-0-323-26436-5.00008-4
Muñoz-Villamizar, A., Santos, J., Montoya-Torres, J. R., & Jaca, C. (2018). Using OEE to evaluate the effectiveness of urban freight transportation systems: A case study. International Journal of Production Economics, 197, 232-242. DOI: https://doi.org/10.1016/j.ijpe.2018.01.011
Nakajima, S. (1988). An Introduction to TPM. Productivity Press, Portland, OR.
De Groote, P. (1995). Maintenance performance analysis: a practical approach. Journal of Quality in Maintenance Engineering, 1(2), 4-24. DOI: https://doi.org/10.1108/13552519510089556
Muñoz-Villamizar, A., Santos, J., Montoya-Torres, J., & Alvaréz, M. (2019). Improving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case study. International Journal of Industrial Engineering Computations, 10(3), 375-392. DOI: https://doi.org/10.5267/j.ijiec.2019.2.001
Haimes, L. Lasdon and D. Wismer, On a bicriterion formulation of the problems of integrated system identification and system optimization. IEEE Transactions on Systems, Man, and Cybernetics, 1:296-297, 1971. DOI: https://doi.org/10.1109/TSMC.1971.4308298
Abramowitz, M., & Stegun, I. A. (1972). Handbook of mathematical functions with formulas, graphs, and mathematical tables (p. 886). New York: Dover Publications.
Phadnis, S., Brevick, J., & Irani, S. (2003). Development of a new heuristic for scheduling flow-shops with parallel machines by prioritizing bottleneck stages. Journal of Integrated Design and Process Science, 7(1), 87-97.
Cortés, B. M., García, J. C. E., & Hernández, F. R. (2012). Multi-objective flow-shop scheduling with parallel machines. International journal of production research, 50(10), 2796-2808. DOI: https://doi.org/10.1080/00207543.2011.593006
Published
How to Cite
Issue
Section
Categories
Copyright (c) 2024 Dao Gia Minh, Phan Thi Mai Ha

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.