A Systematic Approach to Reducing Compressor Downtime by 95.3% Within Six Months Toward Industry 4.0 Implementation
Keywords:
Compressor, Downtime, Production Machine, Punch, WorkshopAbstract
Workshop is one of the sections in the company that is tasked with supporting the productivity process, from Welding fabrication work, motor rewinding, machine tool work, to punch procurement (Mold). Supported by various machines used to support the production process, both for punch repair and fabrication. For this reason, the workshop always tries to provide the best, namely by creating improvements to speed up the process of procuring punches, both lower and upper, as well as master motifs and plain, while the improvements made are making improvements in the Compressor area. Thus, this compressor machine is a vital supporter of the machine's running process and product water usage services to achieve the target results of punch repair in the workshop, the purpose of the research is to add an automatic remote control at the nearest location & can be operated with Wi-Fi, create an auto evaporator cleaning program, install a compressor alarm notification, create an auto drain program for the compressor tube, create a safe compressor room. By implementing several improvements, the results were achieved by reducing downtime by 95.3% to 96.7%. Downtime decreased from 2784 minutes per 3 months to 92 minutes per 3 months. The potential profit was Rp 159.962.422 per year. Therefore, the research results can be applied to all workshop and production machines.
Downloads
References
U. Roysen, I. Rochmad, R. Rahmat, P. L. Ginny, and S. Juniawan, “Reduction of Defect Rate in the Line Maintenance Inspection Process Using Six Sigma Method in an Indonesian Airline,” In International Conference on Engineering, Applied Sciences and Technology, no. June, pp. 1–15, 2024.
M. Natawibawa, R. Rahmat, J. Imron, and D. A. Putra, “Kaji Experimental AC Residensial Inverter Untuk Menjadi Solusi AC Hemat Energi,” Journal of Syntax Literate, vol. 10, no. 8, pp. 6006–6014, 2025. DOI: https://doi.org/10.36418/syntax-literate.v10i8.61120
H. Susanto, M. Harliman Saleh, and P. Kurniasih, “Optimizing The Decrease in The Performance of Main Air Compressor Regarding Air Requirements Maneuvering on MV. Oriental Jade,” Indones. J. Mar. Eng., vol. I, no. 1, pp. 1–8, 2024. DOI: https://doi.org/10.46484/ijme.v1i1.534
Y. K. Sanuki and M. Halil, “Rancang Bangun Kompresor Udara Menggunakan Kompresor Bekas AC Dengan Tekanan 120 Psi,” Doctoral dissertation, Politeknik Negeri Bali, 2025.
W. Ignatius Gunawan, K. Ampala, P. Agus, G. Gutomo, and S. Eni, “Pengujian Unjuk Kerja (Performance) Kompresor Torak Multi Stage Dengan Tabung Tambahan Pada Saluran Keluaran Pada Silinder Pertama,” J. Mech. Eng. Appl. Technol., vol. 4, no. 1, pp. 303–312, 2022.
H. Kusnanto, M. A. Batutah, and B. Pribadi, “Analisa Unjuk Kerja Kompresor Sistem Udara Bertekanan di PT Smart Tbk Surabaya,” J. Tek. Elektro, vol. 6, no. 01, pp. 72–77, 2023.
M. H. Muhammad Ikhsan Lubis, M. T. Lenny Herawati, S.T., A. Nelly Suryani, S.E., M.A.B., C. Yudha Witanto, S.T., M.T., MBB., M. S. Novianda, S.T., and M. T. Rahmat, S.T., OTOMASI INDUSTRI Teknologi dan Implementasi, 1st ed. Malang: Duta Technology, 2025. [Online]. Available: https://penerbitdutatechnology.com/book/56
Rahmat, D. A. Putra, and A. Hermawan, “Sustainable Urban Farming Rack Design Using Eco-Friendly Materials with Variety Load,” JTEP J. Keteknikan Pertan., vol. 13, no. 4, pp. 576–594, 2025, doi: 10.19028/jtep.013.4.576-594. DOI: https://doi.org/10.19028/jtep.013.4.576-594
F. Budiawan, A. B. Wijaya, R. R. Suminar, and D. A. Halim, “Reverse Engineering Katup Kompresor Angin Kaji Dengan Cnc Router,” Jurnal Vokasi Mekanika, vol. 5, no. 4, pp. 334–341, 2023. DOI: https://doi.org/10.24036/vomek.v5i4.578
B. N. B. Simanungkalit and Karti, “Uji Kapasitas Udara yang Dihasilkan Kompresor Sentrifugal 3 Stage pada Unit Energy di PT Toba Pulp Lestari Test of Air Capacity Produced by a 3 Stage Centrifugal Compressor at the Energy Unit at PT Toba Pulp Lestari,” IRA Jurnal Teknik Mesin Dan Aplikasinya (IRAJTMA), vol. 2, no. 1, pp. 58–64, 2023. DOI: https://doi.org/10.56862/irajtma.v2i1.46
Y. I. P. Muhamad and M. Hetharia, “Analisis Daya Pada Kompresor Reciprocating 3K-O1-B TPYE P 116H 280csh di Pertamina Unit VI Kasim Muhamad Yusuf Iriandi Pasau 1 Marlon Hetharia 2,” J. Voering Vol., vol. 7, no. 2, pp. 61–68, 2022.
A. Putra, R. Abu, and A. Azman, “Analisis Penyebab Turunnya Kinerja Kompresor untuk Tindakan Perawatan pada Kapal Tanker MT. Sea Serenity,” JUTIN: Jurnal Teknik Industri Terintegrasi, vol. 6, no. 4, pp. 1652-1658, 2023.
F. Hapsari, N. Asminah, and M. Fa, “Analisa Efisiensi Kinerja Kompresor Sentrifugal (15-K-103) pada Unit Residue Catalytic Cracking di PT Pertamina Internasional Refinery Unit VI Balongan Indramayu,” Jurnal Global Ilmiah, vol. 1, no. 3, pp. 187-192, 2023. DOI: https://doi.org/10.55324/jgi.v1i3.29
R. Rahmat, D. A. Putra, and W. Sutomo, “Utilizing Environmentally Friendly Materials as Sustainable Urban Vertical Farming Racks with Maximum Load,” SINTEK J. J. Ilm. Tek. Mesin, vol. 19, no. 1, pp. 1–10, 2025, doi: https://doi.org/10.24853/sintek.19.2.194-206. DOI: https://doi.org/10.24853/sintek.19.2.194-206
A. Kurnianto, A. D. Joanda, and M. Al Ghifari, “Analisa Penerapan Preventive Maintenance pada Mesin Kompresor Sentrifugal dengan Menggunakan Metode Mean Time Between Failure dan Mean Time to Repair,” J. Kaji. Tek. MESIN, vol. 8, no. 1, pp. 80–86, 2023.
E. M. Sari, M. D. Ashidqi, A. Rokhmah, R. Rahmat, T. Junaedi, and P. Probokusumo, “Analysis of the Effect of Damdex Addition to Concrete Mixture on Compressive Strength,” Eng. Sci. Lett., vol. 4, no. 03, pp. 148–156, 2025, doi: 10.56741/IISTR.esl.001420. DOI: https://doi.org/10.56741/IISTR.esl.001420
A. Hidayat, Suhendra, and Y. Prastyo, “Implementation of Total Productive Maintenance (TPM) on Mitsui Seiki Compressors to Reduce Production Downtime Correspondence Author : a.hidayat5580@gmail.com,” J. Ragam Pengabdi. dan Penelit., vol. 3, no. 1, pp. 1–10, 2026, doi: https://doi.org/10.62710/gm0y0j61. DOI: https://doi.org/10.62710/gm0y0j61
H. Syamsuri and A. Herdiana, “Perancangan Simulator Kompresor Torak Untuk Media Pembelajaran,” J. Mesin Galuh, vol. 1, no. 1, pp. 26–34, 2023. DOI: https://doi.org/10.25157/jmg.v2i1.3084
R. Rahmat, D. A. Putrra, R. N. Restu, and J. Imron, “3D Model Autocad Of The Piston Displacer Cup For A Gamma Stirling Engine Using The API Method,” ELKOM J., vol. 18, no. 1, pp. 86–93, 2025, [Online]. Available: https://journal.stekom.ac.id/index.php/elkom/article/view/2836
Rahmat and I. Iskandar, “Analisis keretakan material mounting boom hydraulic excavator merk Hitachi ZX-470 LC-3f di PT. Darma Henwa Tbk tambang Asam-asam Kalimantan Selatan,” J. TESLINK Tek. Sipil dan Lingkung., vol. 4, no. 2, pp. 124–136, 2023, doi: 10.52005/teslink.v4i2.129. DOI: https://doi.org/10.52005/teslink.v4i2.129
H. Sumardiyanto, R. Rahmat, and S. Sulaiman, “Optimasi Desain Bottom Screen dan Sterilizer Pabrik Kelapa Sawit,” J. Innov. Creat., vol. 5, no. 2, pp. 21830–21837, 2025.
B. Ghorbani, S. Zendehboudi, and N. M. C. Saady, “Advancing Hybrid Cryogenic Natural Gas Systems: A Comprehensive Review of Processes and Performance Optimization,” Energies, vol. 18, no. 6, 2025, doi: 10.3390/en18061443. DOI: https://doi.org/10.3390/en18061443
D. Suhendra and Y. Kusuma, “Analisis Kinerja Sistim Kompresor Udara di Jalur Produksi PT . X Melalui Audit Energi,” Jurnal Teknik Mesin, vol. 10, no. 2, pp. 91–99, 2021. DOI: https://doi.org/10.22441/jtm.v10i2.11893
P. O. Sutrisna and G. P. Suryawan, “Potensi Penghematan Energi Kompresor Melalui Replacement Kompresor Menuju Type Af OPC 55-10,” Jurnal Bakti Saraswati, vol. 11, no. 02, pp. 81-87, 2022.
A. F. Ilham and M. Aqli, “Analisis Penurunan Sistem Kompresor Pada Pembangkit Pt. Indocement Tunggal Prakarsa, Tbk. Kalimantan Selatan,” J. Tugas Akhir Mhs. ROTARY, vol. 3, no. 2, pp. 173–190, 2021. DOI: https://doi.org/10.20527/jtam_rotary.v3i2.4123
J. Ahmad, S. W. P. Pandu, Adi Cakranegara Raudya, and C. S. Octiva, “Analisis Efisiensi Kerja Kompresor Pada Mesin Refrigerasi di,” J. Mesin Nusant., vol. 5, no. 1, pp. 86–95, 2022. DOI: https://doi.org/10.29407/jmn.v5i1.17741
A. M. Wijaya, “Monitoring Penjadwalan Proyek & Evaluasi Jumlah Tower Crane Pada Proyek Condominium & Podium Sebuah Plaza Di Tengah Kota,” Dissertation, Universitas Kristen Petra.
P. Meiti, D. S. Nike, R. Yusrin, and I. Dwiwahju,Sasongko Antonius, “Simulasi Dinamik Pengoperasian Kompresor Sentrifugal Multitahap untuk Mengatasi Penurunan Tekanan Sumur Gas Dynamic Simulation of a Multistage Centrifugal Compressor Operation to Overcome a Pressure Drop in a Gas Well,” J. Otomasi Kontrol dan Instrumentasi, vol. 15, no. 1, pp. 33–45, 2023. DOI: https://doi.org/10.5614/joki.2023.15.1.4
A. T. Salsabila, E. Kurniawati, A. Prawoto, F. Imanto, and D. Robbi, “Analysis of the Decrease in Compressed Air Production of the Air Compressor onboard MT Seroja III,” J-Proteksion: Jurnal Kajian Ilmiah dan Teknologi Teknik Mesin, vol. 10, no. 1, pp. 39–46, 2025, doi: 10.32528/jp.v10i1.3370.
R. Rahman, “Perawatan Kompresor Udara Guna Menunjang Olah Gerak,” LOGI J. Sains dan Teknol., vol. 1, no. 6, pp. 971–977, 2022, doi: 10.55123/insologi.v1i6.4064. DOI: https://doi.org/10.55123/insologi.v1i6.4064
R. Rahmat, P. Da Silva, and A. Maulana, “Vibration Reduction through Centrifugal Fan Balancing in Painting Line Manufacturing,” Int. J. Res. Eng. Sci. Manag., vol. 9, no. 5, pp. 102–106, 2026, doi: https://doi.org/10.65138/ijresm.v9i5.3454. DOI: https://doi.org/10.65138/ijresm.v9i5.3454
M. D. Ashidqi, S. Windasari, Rahmat, and Probokusumo, “Parameter Optimization of Battery Energy Storage System Considering Degradation Using Reinforcement Learning,” J. Nas. Tek. Elektro dan Teknol. Inf., vol. 15, no. 1, pp. 44–52, 2026, doi: 10.22146/jnteti.v15i1.24882. DOI: https://doi.org/10.22146/jnteti.v15i1.24882
R. Rahmat et al., “Project control using S Curve in provision of pedestal crane at PT. Medco E & P Natuna - West Belut Platform,” Priviet Soc. Sci. J., vol. 5, no. 8, pp. 115–124, 2025, doi: 10.55942/pssj.v5i8.489. DOI: https://doi.org/10.55942/pssj.v5i8.489
Published
How to Cite
Issue
Section
Categories
Copyright (c) 2026 Rahmat; Yudha Witanto, Dimas Suryo Ajitomo, Budi Sunarto, Acim Maulana, Pedro da Silva

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.












