Dao, G. M., & Mai Ha, P. T. (2024). Applying Robust Fuzzy-stochastic Programming Model in Multi-objective Optimization for Flow-shop Scheduling with Parallel Machines: a Real-life Case Study in an Engine Component Industrial. Engineering Science Letter, 3(03), 105–116. https://doi.org/10.56741/esl.v3i03.593