[1]
Rahmat, Witanto, Y., Ajitomo, D.S., Sunarto, B., Maulana, A. and da Silva, P. 2026. A Systematic Approach to Reducing Compressor Downtime by 95.3% Within Six Months Toward Industry 4.0 Implementation . Engineering Science Letter. 5, 02 (Aug. 2026), 162–167. DOI:https://doi.org/10.56741/IISTR.esl.002151.